Continuing on with the tear down, I disassemble the unit for inspection.
Pic 1- Components
Pic 2- Char in base with briquets that fell by grill sidewall space on first load up. New grill will have only a 1/2" space to sidewalls.
Pic 3- Air inlet 90’s removed in prep for single port air inlet. Port location to be determined after cyclone heat reclaimer is tacked in place. The 8" cyclone will fit inside the 10" tube heat reclaimer.The round gas outlet pipe was removed. Square flange bolted connections will be used instead.
Pic 4- T minus one to separation
Pic 5- I used a flat bar to gently pop the flanges apart so I could lift the unit off without disturbing the rope gasket. I was concerned about the integrity of the butt joint that I sort of layered together. It looks OK, no evidence of leaking.
Pic 6- A closer view of the gasket joint.